Final specs:
EVOC P650RG 15.6" Custom Built Gaming Laptop w/ nVIDIA GTX 980M w/ G-Sync
LCD Panel
15.6" 1920x1080 IPS FHD (16:9) LED Antiglare Matte Type Display w/ NVIDIA G-Sync Technology (LG)
Display Warranty
30 days no Dead Pixel Warranty
Video Card
NVIDIA GeForce GTX 980M w/ 8GB GDDR5 w/ Unlocked Prema ...
Processor
6th Generation Intel Core i7-6820HK Quad Core Processor, 2.7GHz (Max Turbo Frequency 3.6GHz), 8MB Smart Cache
Prema Custom BIOS - Latest Updated Version
Thermal Paste
Coollaboratory Liquid Ultra 100% Metal Thermal Interface on CPU, IC Diamond on GPU
Memory
32GB (2 x 16GB) G.SKILL Ripjaws Series Dual Channel DDR4/2666MHz
M.2 PCIe NVMe or SATA SSD Slot 1
HIDevolution Specified 1TB M.2 SATA 6Gb/s SSD
1st 2.5" SSD Bay
Samsung 850 EVO Series (3D VNAND Tech) SATA3 6Gb/s 1TB SSD
2nd 2.5" SSD Bay
Empty HDD bay (with caddy/adapter)
Wireless Cards
Intel 8260
Operating System
Genuine Windows® 10 Home, 64bit, English - $80.00
Power Adapter
200W AC Power Adapter (supports 100-240V)
Power Cord
UK 6 Ft Power Cord C13 - $10.00
Internal Battery
1 x 4 cell battery - 60Wh (Internal)
Audio
Onkyo Speakers x 2
Back-lit Gaming Keyboard
Customizable Gaming Macro Back-lit Keyboard
Keyboard Language
U.S. English
Warranty and Service
1 Year HIDevolution Limited Global Warranty + LIFETIME ...
06/07/2016 - After a long round of discussions and back and forth emails specs confirmed.
06/07/2016 - Revised Order sent by HIDEvolution
06/07/2016 - Payment initiated from my side.
Things get interesting here. On account of it being a bank holiday in the UAE for the next 4 days, payment will actually be initiated from the bank on Sunday 10/07/2016
Which means it will get through to HIDEvolution most likely by Tuesday 12/07/2016.
HIDEvolution informs me that pre production/ gathering of the components for my laptop can start only after the funds have reached their account. Which is a big waste of time in my opinion (and illogical). Which means this laptop is at least 2 weeks away.
12/07/2016 - Funds have reached HIDevolution (finally). Apparently 28$ short. Transfers with my bank are free so....? No update on the build yet.
12/07/2016,2 - 28$ shortage waived. Build will start Tuesday morning PDT time.
12/07/2016,3 - Build in Production.
13/07/2016 - Laptop expected to ship by Friday. Fingers crossed .
15/07/2016 - Ship estimate changed to Monday 18/07/2016. Repeated follow ups are not appreciated.
Experience with HIDEvolution - EVOC P650RG
Aucun commentaire:
Enregistrer un commentaire